Registration is required.
Jan 28
The Flow Assurance TAC 's goal is to assure reliable and economic production in deepwater by the appropriate design and operation through prediction, management remediation of deposition and line plugs by focusing on organic, inorganic and solids management.
More information
Ultra-Deepwater Subsea Systems TAC Meeting
Jan 28
The Subsea Systems TAC's goal is to develop technology and qualify equipment to enable the deployment of "subsea facilities for 60 mile tie-backs from 10,000 foot water depth." Focus is subsea production equipment, subsea processing technology, pipeline, flowline and umbilical technology, and subsea well intervention improvement.
Ultra-Deepwater Drilling, Completions, and Interventions (DCI) TAC Meeting
Jan 29
The DCI TAC's goal is to improve deepwater drilling operations.
Floating Facilities and Risers & Systems Engineering/Geosciences (FLF/SEN)TAC Meeting
Jan 29
The FLF/SEN TAC's goals are to further technology and fill gaps related to deepwater floating systems and their associated moorings and risers and to analyze existing and/or potential technology gaps in systems and other cross-functional designs and processes.
Ultra-Deepwater Environmental, Safety & Regulatory and Metocean TAC Meeting
Jan 30
The goals include improving safety and environmental compliance in all E&P technical areas, securing regulatory compliance as needed for technical advances, and improving knowledge and modeling capabilities of the Gulf of Mexico circulation for more accurate facility design criteria and reduced downtime during deepwater drilling operations.
More information