
Call 3-1-1 To report construction related issues
Ms. Jody Craze
Sr. Project Manager
City of Houston
832-395-2392 (p)
832-395-2403 (f)
Email
Project Manager:
Moises Ayala
832-262-0221 (c)
Project Superintendent:
Luke Morganti
832-265-7470 (c)
Superintendent:
Jose Diaz
832-265-7434 (c)
For Chinese-speakers
please call:
Nikki Yuzhen Liang
832-955-8608
Traffic Change Bellaire and BW8 Phase 3 Step 1
The Contractor will be implementing the following traffic control plan. Work will be done on the Northeast corner of Beltway 8 and Bellaire Blvd. They will be installing the crosswalk at the northwest intersection of Bellaire and Beltway 8. Traffic traveling Northbound on the Access Road of Beltway 8 will be reduced to one left turn lane, one lane going through. This set up will be continuous from Monday June 2, 2014 to Friday June 13, 2014.
If you have any questions, please contact Jody Craze, Sr. Project Manager.
Traffic Control at Beltway 8 and Bellaire North
Please be aware that the speed limit through the Bellaire construction zone is now posted at 25 mph. Fines are doubled within a construction zone so please do not make illegal turns, and obey posted traffic signs.
