Interior Framing Scrimmage

As with most projects, Architects will draw or model interior walls to show the outside of drywall only. This is for clarity’s sake when the documents are printed. This also allows printed sheets to show walls using only two lines and makes dimensioning easier.

 

During the work on the new Trimble Campus in Westminster, CO, the general contractor, JE Dunn, was able to model the interior framing down to the individual metal studs utilizing Tekla Structures metal stud framing components. The reasons for taking the modeling to this level were two-fold: one for quality control to ensure mechanical, electrical, and plumbing systems were actually within the stud cavity; and two, to be able to layout with the Robotic Total Station where the actual bottom framing track would be installed. By laying out the actual track location, in lieu of just the outside of finished wall, it saved the framing subcontractor from having to chalk finish and offset lines for each side of wall.

 

Using multiple monitors to show the PDF floor plans with wall type call outs, door schedules, window schedules, wall schedules, and the Tekla Structures model with the Architectural model overlaid, it was easy to cross reference actual opening sizes and wall types while modeling the interior framing. The first floor consisted of approximately 32,000 SF of support spaces including training facilities, demonstration areas, office space, loading docks, storage, fitness area, cafeteria, and reception. Most of the first floor walls were 1-Hour fire rated walls framed in 2-1/2”, 3-5/8” or 6” metal studs, but several areas were or 2-Hour fire rated walls for life-safety exit corridors or storage areas. The Tekla Structures metal stud framing component created each type of wall with correct dimensional offsets for the fire rating and correct king-stud framing around door and window openings. The second through fourth floors consisted of office areas, meeting spaces, and core functions and basically repeated from one floor to the next.

 

Several issues were found during the modeling of the interior metal stud walls. One issue was that many walls modeled by the Architect with only two lines extruded vertically were drawn with the incorrect widths, and therefore any plan dimensions would be flawed. In addition, when the second, third, and fourth floors were modeled down to the metal stud level and then isolated in plan view, many of the walls that were meant to stack vertically did not match up. This inconsistency from floor to floor could have been due to different detailers drawing different floors or modifications made during the design process that affected one floor but were not transferred to the other floors. Although minor dimensional discrepancies from floor to floor seem harmless, this would have caused issues with the MEP trades trying to run vertical piping from one floor to the next. Another issue that would not have been discovered without modeling of the interior framing were plumbing waste and vent lines that were within the architectural wall lines but not within the actual stud cavity, thereby causing drywall to be bowed or a change to the framing.

 

This is a common issue on most projects and it requires a wall to be moved or a furring wall built to hide the piping. Modeling of the interior stud walls allowed these issues to be caught before any boots, materials, or equipment even hit the ground.

 

Here are a few words of caution for anyone new to the modeling of interior metal or wood stud framing. Many times the Architects will have interior details shown as typical call outs. These typical details often are not shown in the standard Architectural model based upon the level of detail the model was created to or required by contract. Many details such as end points of the walls or where they intersect with exterior framing or curtain walls will not be shown exactly. Many specifications will require a certain distance between the door jambs and interior corners of adjacent walls. Many times the Architectural models will not show the jambs and the typical distance off of interior corners to allow for ADA access or finishing of drywall. These issues often don’t get picked up by interior framing crews either, but if the model to the field workflow is to be implemented, the person modeling the interior stud walls will need to reference the entire drawing package and specifications.

 

As the framing and drywall subcontractor, Phase 2, did not have an internal BIM department or total station layout. So JE Dunn laid out all interior walls at the actual track line by placing points with the Trimble Robotic Total Station (RTS) and Trimble Field Link Tablet at every interior and exterior metal track corner, every door jamb, all openings, every window corner, all column surrounds, MEP chases, and even the curvilinear soffits overhead. It was decided that priority walls would be laid out first for drywall top out prior to critical ductwork and other MEP installations with the remaining walls laid out as time allotted. Once the track lines were chalked, the MEP trades were required to lay out any special openings for duct, piping, or chases before the framing started to ensure there was not wasted time framing the standard 16” on center studs with the MEP trades ripping out studs later during installation. JE Dunn even went down to creating points for the fire extinguisher cabinets to ensure they were framed correctly and the MEP trades did not use up the intended stud cavity. As MEP penetrations and sleeves were QC checked with the RTS and Trimble Field Link prior to concrete pours, almost every sleeve and penetration were within the actual stud cavity upon completion.

 

JE Dunn also laid out exterior walls for prefabricated panel sections by placing center lines of the panels and offset lines of the grid. With the steel and concrete edges being so closely monitored and controlled, the prefabricated panels went in smoothly and allowed for guaranteed window openings which were also prefabricated and set quickly. As almost every interior wall went to the bottom of the metal deck, a decision was made that the interior walls would not be prefabricated. Checking for pre-and post-pour camber with the Trimble RTS allowed the contractors and subcontractors to adjust their coordinated models prior to any installation occurring. However, with laser scanning and RTS layout, future projects will be able to prefabricate entire wall sections with drywall installed on one side and MEP stubs already in place and be able to roll the walls directly onto the track lines as long as room is made for slip track at the top of wall or they are not taken all the way to the bottom of deck.

 

Many people on our project did not believe that using the RTS was any faster or more accurate than utilizing the traditional methods of laying out with tape measures off of grid lines. So we decided to host a friendly scrimmage. After laying out all of the interior and exterior walls for floors 1 – 3, we hosted a layout competition on the 4th floor in order to get side by side comparisons and metrics for the utilization of the Trimble RTS.

 

 

Caption:Interior wall layout competition coin toss to see which side of the building the traditional layout team got to choose versus the Trimble Robotic Total Station.

 

Phase 2 had their best crew for interiors walls race JE Dunn using the Trimble RTS. Phase 2 utilized their traditional plans, tape measures, chalk lines, and squares. In order to make sure the competition was fair, the Phase 2 was allowed to pick which half of the building they were going to lay out after winning a coin toss. After the competition was over, JE Dunn’s team had produced 200 points in the time that it took Phase 2 to lay out 100 points; basically JED was able to layout 2/3rd of the building within the same timeframe Phase 2 laid out 1/3rd.

 

 

Caption: Images from the layout competition on the Trimble Westminster building. Image on the left shows one-man layout with the Trimble Robotic Total Station and Trimble Field Link. The image on the RFI’s to the Architect for answers.

 

Phase 2 was also missing numerous dimensions that weren’t on the drawings, they laid out items incorrectly as they referenced the wrong “typical” plan for several rooms, and they did not have any information on windows, soffits, or openings that were already in the model. Typically the Architect can’t provide all the dimensions on the plans as it adds too much clutter. So on a normal project, the framing subcontractor would have to stop production, submit a RFI, and then wait for 1 – 2 weeks per their contract to get the answer back and then the team could check to see if the answer worked. However, with model-based layout, the drawings are created directly from the model, and then we are exporting those points directly to the Trimble RTS and Field Link for layout so there are no missing dimensions. Although JE Dunn did spend time modeling the stud walls in Tekla and then creating the points within the model, Phase 2’s layout crew also spent quite a bit of time going through the drawings and preparing a cheat sheet for dimensions and layout to help increase their productivity.

 

 

Caption: Tekla Structures Model showing the Architectural model transparent with metal stud walls and layout points at each stud wall corner, doorframe, and even fire extinguisher cabinet openings.

 

 

Caption: Tekla Structures Model showing the Architectural model transparent with metal stud walls and layout points at each stud wall corner, doorframe, and even fire extinguisher cabinet openings.

 

 

Caption: Tekla Structures model showing mechanical openings detailed down to the individual metal stud layout.

 

 

Caption: Typical floor plan for Trimble’s Westminster building showing how a basic square building can still cause problems for a traditional layout team and how efficient Trimble’s BIM to the Field work flow really is.

 

We invite you to read through all the case studies from our Westminster Campus building project. Twenty-nine different Trimble building technologies were used on this project and these case studies highlight different efforts including concrete, steel, exterior framing/glazing, and this piece on the interior framing. After reading through these different case studies, consider for yourself if the Trimble Total Station would make sense for your team. We’ve developed an ROI calculator to help you develop the business case.

 

Who Is Trimble Buildings?

Trimble Buildings is the new group from Trimble Navigation, Ltd. dedicated to building construction hardware, software, and services. Built on Trimble’s own 20-year history with jobsite solutions for layout and measurement, Trimble Buildings strives to deliver real-time project data to people who need it most, whether at the jobsite, the HQ, or any place in between.

 

Here are the solutions specifically designed for General Contractors and Construction Management firms:

 

We have all gotten a call from an Owner with the plans for a new stadium or laboratory. The program sounds amazing and the thrill of a new project takes over. We want to get started right away, so the Design Team and GC open SketchUp Pro to start mapping out the plans and seeing the project come to life. So many Architects, as well as General Contractors and Construction Management firms, use SketchUp Pro to get a jump start on the project, not only for conceptual estimates and visualization, but also because it is bar none, the easiest way to draw in 3D.

Case Study: SketchUp Pro Virtual Mock-Up on Westminster Campus

Case Study: SketchUp Pro for Prefab on a Data Center Project

 

Contractors who self-perform concrete and steel need a comprehensive 3D modeling platform to capture the complexity of their projects. Tekla Structures delivers in spades. Tekla BIMsight enables the entire construction workflow to combine models, check for clashes, and share information—in the same easy-to-use BIM environment—empowering project participants with the insight to solve issues in the design phase, before construction begins.

Case Study: Tekla Structures for Concrete on the Westminster Campus

Case Study: Tekla Structures for Steel on the Westminster Campus

Webinar: Using Tekla Models in Vico Office

 

Vico Office delivers an integrated BIM workflow for construction projects. Vico Office extends basic 3D models with constructability analysis and coordination, 4D location-based scheduling and production control, and 5D estimating. Now BIM-based projects, including models from all the popular BIM authoring tools, are managed with rigor, science, and connectivity. And the integrated workflow means that every time the models are updated with design changes, GCs and CMs immediately see the schedule and budget implications.

Demo: Vico Office Presentation

 

Organizing and routing construction project data to the people who need it most is what Prolog does best. RFIs are routed, budgets are reconciled, drawings and documentation are organized – it’s Command Central whether you are walking the site with a tablet, updating contracts in the trailer, or managing project cash flow back at HQ. Prolog is the complete system of record for managing construction project information.

Webinar: What’s New in Prolog 9.7

Webinar: Collaboration at the Speed of Prolog

Webinar: Prolog Unplugged

Blog: Not Your Grandfather’s Project Management

 

Trimble Field Solutions are ubiquitous on construction jobsites around the world. The hazard yellow rugged tablets and Robotic Total Stations are hard to miss. But did you know that this equipment and their critical layout measurements are integrated with the project models in Vico Office and Tekla BIMsight? Installation points from the coordinated models are exported to the field equipment for layout slab edges, openings, and sleeve penetrations. Using these layout points makes the process much more efficient, as one person can now do the job of three. It also improves accuracy and quality by ensuring that vertical work is aligned and no offsets or rework will be needed during installation. We also run the process in reverse for quality assurance: points can be captured to validate that field installation matches the coordinated design.

Case Study: RTS with Tekla for Concrete Layout

Case Study: RTS with Tekla for Steel Layout

Case Study: RTS with SketchUp for Exterior Framing and Glazing

 

Trimble also provides Laser Scanning hardware and software so your team can compare the as-built conditions with the as-planned design, augment existing 3D data, or even create documentation where none existed on older structures. You can scan existing mechanical systems to better understand existing conditions and design a new build-out. You can scan existing structural components to create an architectural or structural model. And, of course, you can scan to verify what was intended in the model to what has been constructed on-site, whether that be the edge-of-slab after a concrete pour. You can also scan a floor for level and make the needed adjustments before interior framing.

Webinar: Best Practices for Laser Scanning

Webpage: 4 Use Cases for Laser Scanning

FAQs: Frequently-Asked Questions about Laser Scanning

 

We recognize that GCs and CMs need and want estimating solutions that fit the way they work. WinEst comes to the table with the industry’s most powerful, robust and adaptable cost-estimating and cost-modeling software—a database-driven estimating solution that uses a highly flexible spreadsheet for creating, adjusting, and presenting estimates. Having a highly-customizable database allows each contractor to capture their methodology and best practices for creating detailed estimates.

Webinar: Sharpen Your Competitive Edge with WinEst Estimating

FAQs: Frequently-Asked Questions about WinEst

 

And Modelogix is the keystone for Trimble Buildings’ construction solutions. Modelogix enables contractors to analyze their project cost history for fast and accurate creation of early-phase budgeting and benchmarking against the final detailed estimate. We can compare project estimates from WinEst and Vico Office and any other estimating package, as well as reconciled budgets from Prolog.

Webinar: Adding Modelogix to Your Estimating Arsenal

Webinar: Capturing Estimating Experience with Modelogix

Blog: Harnessing Your Estimating IP

FAQs: Frequently-Asked Questions about Modelogix

 

Finally, VDC Services extends your team’s capabilities overnight. Whether you need to augment your staff for a new project or learn new BIM workflows and best practices side-by-side, our team is ready. We can customize any package to include:

• Business Development Support

• 2D Change Reports (between two
   document sets)

• 3D Model Assessment

• 3D Constructability and
   Coordination

• 4D Schedule Simulation and
   Optimization

• 5D Model-Based Quantity Takeoff
   and Estimates

• Laser Scanning and As-Built Models

 

Trimble Buildings is dedicated to making our customers more productive, more informed, and more profitable. Together we can build a better world.

New Prolog Administrators Class

Lock in Your Space at the December 11-12, 2013 Prolog Administrator’s Class

 

So many customers enjoyed the recent Prolog Unplugged webinar, that we are opening up a December Prolog Administrator’s Class.

 

This is an on-site training opportunity on December 11-12 at our Folsom, California, office to fully engage without the competing disruptions we all encounter in our regular office surroundings. Interact face-to-face, share ideas with peers, and practice with hands-on exercises in our training lab! Together we’ll enable multiple portfolios, configure security, customize views, and utilize notifications to successfully deploy Prolog. Plus, our trainers have been in your shoes – they can mentor and guide you through the most complex real-life Prolog scenarios.

 

Read more about the class and register today as space is limited. And please be sure to forward this message along to your colleagues – we don’t want anyone to miss out. For a list of future classes, please visit the Prolog Training website.

 

 

When we meet you face-to-face, we look forward to making you as successful as possible with your Prolog rollout! Your team will love their Prolog solutions and their Administrators that much more if all the features are dialed up to the maximum. So register for the December Prolog Administrator’s Class today!

       

 

For more information on Trimble Buildings, our hardware, software, and VDC service offerings, or the AGC BIMForum, please visit our website or contact Holly Allison directly at +1-978-882-0170 x118.

 

Trimble Buildings GC/CM Group >< 120 Washington Street, Suite 202-C >< Salem, MA 01970 >< +1-978-882-0170