New Garage Spaces
A portion of the new concrete driveway and curb has been completed and the construction of the building is scheduled to begin the first week in October.
Of the 15 new garages about to be built, only 2 remain!
The site plan above shows the remaining available spaces. If you're interested, don't hesitate as these have gone quickly!
Each unit will be approximately 32 ft 6 in wide by 31 ft deep and 14ft ceiling height. Included is a 20 ft x 12 ft overhead door, in-floor heat, rough plumbing for a half bath, 6 - 8ft led light fixtures, 6 outlets and interior walls and ceiling finish with a white steel liner.
The anticipated move-in date is the spring of 2024.
Please call Joe for information. 612-581-0591
|