495 NEXT LANE CLOSURES & TRAFFIC CHANGES

September 9 - September 14, 2024

The following construction-related lane closures and traffic changes are planned in the I-495 Express Lanes Northern Extension (495 NEXT) project corridor. Travelers may encounter delays in this area. All work is subject to change based on weather and other factors.


Visit 511virginia.org for information on work zones and lane closures.

495 NEXT Project Area Map

495 NEXT Project Area Map

Highlights for This Week

  • I-495 North and South – Daytime single lane closures and nighttime triple lane closures with periodic traffic stoppages


  • Live Oak Drive – Daytime flagging operations


  • Georgetown Pike – Daytime single lane closure


  • Old Dominion Drive – Day and nighttime flagging operations


  • Dulles Toll Road – Daytime single lane and shoulder closures, and nighttime double lane closures

Lane Closures 

I-495 (CAPITAL BELTWAY)


Monday, September 9, through Thursday, September 12, 9:30 a.m. to 2:30 p.m.

Single lane closure on southbound I-495 between George Washington Memorial Parkway and Lewinsville Road for road widening work.


Monday, September 9, through Thursday, September 12, 10 a.m. to 3 p.m.

Single lane closure on northbound I-495 between Lewinsville Road and George Washington Memorial Parkway for road widening work.


Monday, September 9, through Thursday, September 12, 9:30 p.m. to 5 a.m. and Friday, September 13, and Saturday, September 14, 10 p.m. to 7 a.m.

Triple lane closures with periodic total traffic stoppages on north- and southbound I-495 between George Washington Memorial Parkway and Dulles Toll Road for demolition of the old Live Oak Drive Bridge and overhead sign work. One lane will remain open, with full traffic stoppages of up to 30 minutes each occurring between midnight and 5 a.m. Click here for more information about the demolition of the old Live Oak Drive Bridge.


Friday, September 13, 9:30 a.m. to 12 p.m.

Single lane closure on north- and/or southbound I-495 throughout the project corridor as needed for maintenance work and traffic management.

LIVE OAK DRIVE


Monday, September 9, through Friday, September 13, 9 a.m. to 3:30 p.m.

Live Oak Drive will be reduced to a single lane between the Langley Swim and Tennis Club and Balls Hill Road for paving, sidewalk, drainage and retaining wall construction. Flagging operations alternating single traffic lanes will be in effect.

GEORGETOWN PIKE INTERCHANGE


Monday, September 9, through Friday, September 13, 9:30 a.m. to 3 p.m.

Single right lane closure on westbound Georgetown Pike between Dead Run Drive and Balls Hill Road for road widening work.

OLD DOMINION DRIVE


Monday, September 9, through Thursday, September 12, 9:30 a.m. to 3 p.m. and 10 p.m. to 5 a.m., Friday, September 13, 9:30 a.m. to 2 p.m. and 10 p.m. to 9 a.m., and Saturday, September 14, 10 p.m. to 8 a.m.

Old Dominion Drive will be reduced to a single lane between Dominion Court and Dulany Drive for bridge girder work. Flagging operations alternating single traffic lanes will be in effect. Click here for more information about the girder setting work at the new Old Dominion Drive Bridge.

DULLES CORRIDOR INTERCHANGE 


Dulles Toll Road


Monday, September 9, through Thursday, September 12, 9 a.m. to 3 p.m.

Single left lane closure on westbound Dulles Toll Road (267 Connector) from the I-495 interchange to Chain Bridge Road (Route 123) for road widening work.


Monday, September 9, through Friday, September 13, 9 a.m. to 3 p.m.

Right shoulder and single lane closure on eastbound Dulles Toll Road from Spring Hill Road to the I-495 interchange for road widening work.


Monday, September 9, through Friday, September 13, 9 p.m. to 5 a.m.

Double lane closure on eastbound Dulles Toll Road from Spring Hill Road to the I-495 interchange for barrier removal.

Traffic Changes

New Exit Ramp for I-495 North Exit to Dulles Toll Road


Reminder: Motorists traveling on northbound I-495 heading for westbound Dulles Toll Road must take a new, earlier exit. The new exit ramp is located about one-third of a mile ahead of the old, closed Exit 45. To facilitate this new traffic pattern, I-495 has been reduced from four to three lanes for approximately one-half mile near the Dulles Corridor interchange.

George Washington Memorial Parkway West at I-495


Reminder: The ramp from westbound George Washington Memorial Parkway to southbound I-495 (Capital Beltway) was reduced from two lanes to one lane to make room for a construction vehicle haul route that will be separated from traffic by a physical barrier. This traffic change will be in effect throughout construction on the 495 NEXT project.

Project Background

The I-495 Express Lanes Northern Extension (495 NEXT) project will extend the existing 495 Express Lanes north by two-and-a-half miles from the Dulles Corridor interchange to the George Washington Memorial Parkway interchange in the vicinity of the American Legion Bridge. The project will provide new and improved connections at the Dulles Corridor and George Washington Memorial Parkway.


Other project benefits include four miles of new bicycle and pedestrian connections including a shared-use path parallel to I-495 from Lewinsville Road to near Live Oak Drive, replacement or rehabilitation of seven bridges with pedestrian accommodations, replacement of nine existing noise walls and construction of a new noise wall, environmental improvements introducing stormwater management facilities and funding of restoration at Scott's Run stream, and dedicated funding to support transit improvements in the corridor including new bus service over the American Legion Bridge. 

 

495 NEXT is a public-private partnership project between the Commonwealth of Virginia and Transurban, operator of the existing 495 Express Lanes. Lane Construction is the design-build contractor for the project. The new extended lanes are scheduled to open in 2025. 

Learn More About the Project


Check out 495next.vdot.virginia.gov for additional information.


Sign up to receive project email updates.



Laptop showing 495 NEXT website

Questions?

Email: 495NorthernExtension@vdot.virginia.gov

Call: Construction Inquiry Line, 703-592-6430

Virginia Department of Transportation, Michelle Holland, 703-586-0487

Transurban, Amanda Allen, 571-249-8784

Lane Construction, John Undeland, 703-785-3461

Facebook  Instagram  X  YouTube