WEST CAMPUS

DATA SCIENCE AND COMPUTATION COMPLEX:

  • Deliveries from 5:45am to 10am will increase traffic on Jane Stanford Way. Please obey flag persons.
  • Expect increased traffic on Lomita Drive due to deliveries and debris removal.
  • Concrete demolition at the northwest corner of the site, near Blend Eatery, will be noisy.
  • Excavation for the stairs on the east side of the site will involve heavy machinery and increase dirt truck traffic. 


JANE STANFORD WAY - NIGHT WORK:

  • Installation of chilled water on Jane Stanford Way, between North-South Axis Rd and Via Ortega continues.
  • Jane Stanford Way, between North-South Axis Rd and Via Ortega, will be closed from 9pm to 6am. Please follow the posted detour for vehicles and bikes.
  • The southern sidewalk on Jane Stanford Way, between North-South Axis Rd and Via Pueblo, will be closed during construction. Pedestrians, please follow posted detour.
  • Work hours are 8pm to 6am, Monday through Thursday, with the road closure beginning at 9pm.

 

HISTORY CORNER - NIGHT WORK:

  • Fire water work continues this week. A section of the courtyard (Building 200) is projected to remain closed through the month of April.
  • Access to Building 200 from the courtyard will be impacted during construction. Pedestrians, please follow the posted detour.
  • Access to Olives Café will not be impacted during construction.
  • Work hours are Monday through Thursday, 9:30pm to 7:30am.

 

HISTORY CORNER - DAY WORK:

  • Installation of handrails in the lower courtyard (Building 160 and Building 200) will take place on Saturday, 4/20, from 7am to 4pm. This work is expected to be loud. Please plan accordingly.
  • Access to Olives Café will not be impacted during construction.


MAIN QUAD - NIGHT WORK:

  • Electrical Reliability Improvements (ERI) work begins in the Main Quad.
  • Some pedestrian detours will be in place, please follow detour instructions.
  • Work hours are 9:30pm to 8am, Monday through Friday.

EAST CAMPUS

MAPLES PAVILION EXPANSION:

  • Underground utilities installation will continue through Spring. Expect excessive noise and dust.
  • The sidewalk on Campus Drive is closed. Follow detour signs to ensure your safety.
  • Fire water tie in will continue with an expected end date of 5/27. The path between Maples and Arrillaga Sports Center will be partially fenced off during this time and bike racks will be closed. 

 

TAUBE TENNIS SOUTH (ENCINA TENNIS COURTS):

  • Intermittent disturbances may occur on the paths adjacent to the courts through October due to construction activities. 
  • Tree boxing will occur Friday 4/19 possibly continuing Saturday 4/20 and Monday 4/22. The path next to Taube South leading to Maples will be partially blocked off during this time.

 

FIELD HOCKEY FIELD REPLACEMENT:

  • Intermittent disturbances may occur around the field due to construction activities through July.


GRADUATE SCHOOL OF EDUCATION:

  • Escondido Mall remains closed between Meyer Green and Lasuen Mall.
  • The CERAS gate will be utilized weekly for dumpster removals/replacements, material deliveries, and dump trucks.
  • Structural upgrades of GSE North are ongoing; expect increased noise and vibration.
  • Large concrete pours will occur Monday, 4/22, Thursday, 4/25, and Friday, 4/26, starting at 5am and concluding by early afternoon. Please be alert for concrete trucks entering the site via Escondido Road/Mall.
  • A small concrete pour will occur the morning of Tuesday, 4/23 (official start time TBD). Please be alert for concrete trucks entering the site via Escondido Road/Mall.
  • Work will occur this Saturday, 4/20, including scaffolding and steel work at GSE North.
  • Follow all posted signage around the site fence for alternate pathways.


MEYER GREEN PATHWAY & PLANTING: 

  • Paving and planting work continues near Meyer Plinth on the north and south sides of Panama Mall. 
  • Please observe posted detour signs and use caution when traveling in the area.


OLMSTED ROAD UTILITIES:

  • Installation of domestic water on Olmsted Road continues this week.
  • Domestic water shut down and tie-ins are scheduled as follows:
  • Building 71 and Building 77, Thursday 4/25, 8:30am to 5:30pm
  • Building 78 and Building 79, Friday 4/26, 9am to 12pm
  • Mulberry House and Acorn House, Saturday 4/27, 9am to 5:30pm
  • Building 82 and Building 83, Monday 4/29, 9am to 12pm
  • Building 80 and Building 81, Monday 4/29, 9am to 5:30pm
  • One lane, two-way traffic on Olmsted Road continues.
  • Work hours are 9am to 5pm, Monday through Friday.


PAMPAS LANE POLICE YARD:

  • Loud demolition work continues this week, and grading work will begin towards the end of the week.
  • Pedestrian pathways will be modified, but will remain open during construction. Pedestrians, please follow the posted detour.
  • Work hours are 6:30am to 3:30pm, Monday through Friday.


CROTHERS WAY EXTENSION:

  • Construction for the trash enclosure will commence this week.
  • Pedestrian access will not be impacted during construction.
  • Expect loud demolition and vibration during work hours.
  • Work hours are 8am to 4:30pm, Monday through Friday.


QUILLEN HIGHRISE RENOVATION:

  • Crews will be working Saturdays, from 9am to 5pm.


RESERVOIR 1 PUMP STATION:

  • Utility installation will occur from 4/22 to 6/28.
  • Work hours are 7:30am to 4:30pm, Monday through Friday.
  • No closures to the Dish Trail are anticipated. Please follow posted signage for pedestrian detours.

CONSTRUCTION MAP

Click to view interactive construction map.

SAFETY REMINDERS

  • Avoid using cell phones while walking or biking, especially around construction sites.
  • Pay attention to your surroundings as you walk, run, bike, or drive around campus.
  • Anticipate detours in construction areas and follow the directions of flaggers and signs.
  • If you're riding a bike, follow the rules of the road - stop at signs.
  • Allow a little more time than usual to travel on campus. 

ABOUT US

HEADS UP is a campaign designed to inform the campus community of construction activity and to provide strategies for navigating safely, whether on foot or on wheels.


Look out for HEADS UP signs around campus to warn you of construction-related detours or new circulation behaviors.


You are receiving this email as a valued member of our campus community.
Thank you in advance for your understanding and cooperation.
Please feel free to forward this email or encourage others to subscribe.
Questions or feedback? Reach us at headsup-updates@lists.stanford.edu

To report disability access concerns related to any construction occurring on campus, 
including disabled parking or path of travel issues, please contact disability.access@stanford.edu


Forward
Subscribe