STANFORD COMPUTING AND DATA SCIENCE:
- Deliveries from 6am to 9am will increase traffic on Jane Stanford Way. Please obey flag persons.
- Expect increased traffic on Lomita Drive due to deliveries and debris removal.
- East stair work will involve heavy machinery and increase truck traffic.
- Concrete pours are scheduled for 8/16, 8/22, and 8/26.
JANE STANFORD WAY - NIGHT WORK:
- Installation of chilled water continues on Jane Stanford Way, between North-South Axis Rd and Via Ortega.
- Jane Stanford Way, between North-South Axis Rd and Via Ortega, will be closed from 9pm to 6am. Please follow the posted detour for vehicles and bikes.
- The southern sidewalk on Jane Stanford Way, between North-South Axis Rd and Via Pueblo, will be closed during construction. Pedestrians, please follow the posted detour.
- Work hours are 8pm to 6am, Monday through Thursday, with the road closure beginning at 9pm.
MAIN QUAD - NIGHT WORK:
- Electrical Reliability Improvements (ERI) work is ongoing in the Main Quad.
- Some pedestrian detours will be in place, please follow detour instructions.
- Work hours are 9:30pm to 8am, Monday through Friday.
VIA PUEBLO SANITARY SEWER IMPROVEMENTS:
- Sanitary sewer improvements will begin on Monday, 8/12, on Via Pueblo, between Via Palou and Lomita Mall.
- Two ADA stalls will be closed on Thursday, 8/15, and Friday, 8/16.
- Pipe bursting will take place on Friday, 8/16.
- One lane along Via Pueblo will be closed as needed. Vehicles, please follow flagger instructions.
- Pedestrian pathways will be modified, please follow posted detour signage.
- Working Hours are from 6am to 3pm, Monday through Friday.
DEEP LAB AT END STATION III:
- Ongoing deliveries to the HEPL South building will take place.
- Interior dust mitigation measures including a visqueen containment will be set up around the existing Gratta lab & MTR.
- Interior selective demo of basement restrooms and structural elements will begin; expect loud noise from demolition & fans, along with vibration and dust.
- Ongoing demo debris removal will take place.
- Work hours are 5am to 3pm, Monday through Friday.
VARIAN BUILDING DECK LEAK REMEDIATION:
- Pedestrian routing will be modified during construction, please follow posted detour signage.
- Paver installation is ongoing. Expect noise from saw-cutting.
- Working Hours are from 6am to 3pm, Monday through Friday.
ARBORETUM ROAD:
- Pathway improvements and water line installation continues near Lasuen Street and Arboretum Road.
- Work hours are from 8am to 5pm, Monday through Friday.
- Please use caution when traveling in the area.
ROBLE HALL UTILITY IMPROVEMENTS:
- Lake water utility improvements/testing will be completed next week, with hardscape restoration to follow.
- Vehicular and pedestrian pathways will be modified, please follow posted detour signage.
- Work Hours are from 9am to 5pm, Monday through Friday.
TRESIDDER CHILLED WATER:
- Chilled Water resiliency project from 8/26 to 9/4, at the intersection of Duena Street and Santa Teresa Street.
- Pedestrian and bike traffic will be routed around this area, please use caution and follow all detours.
- The blue tower will not be available during this work.
- Expect some dust and noise due to excavation work.
| |
GRADUATE SCHOOL OF EDUCATION:
- Escondido Mall remains closed between Meyer Green and Lasuen Mall.
- Work will occur this Saturday 8/10, including glazing work at GSE South. No elevated noise or activity is expected.
- Concrete pours will occur Wednesday, 8/14, and Friday, 8/16, starting at 5am and concluding late morning. Please be alert for trucks entering the site via Escondido Mall/Road.
- The CERAS gate will be utilized weekly for dumpster removals/replacements, material deliveries, and dump trucks.
- Structural upgrades of GSE North are ongoing, including the demolition of the concrete matt slab in the GSE North courtyard; expect increased noise and vibration.
- Follow all posted signage around the site fence for alternate pathways.
MEYER PLINTH:
- A new sculpture will be installed at Meyer plinth this fall.
- Deinstallation of the current sculpture will begin next week.
- Please observe pathway closures and follow posted detour signage.
LASUEN UTILITY RESTORATION:
- Pedestrian pathways will be modified during construction, please follow posted detour signage.
- Grading work for pathways continues this week.
- Storm drain installation and irrigation work will begin.
- Concrete placement will be ongoing. Expect backup alarms and minor noise from activities.
- Work Hours are from 6:30am to 3:30pm, Monday through Friday.
LASUEN ESCONDIDO CIRCULATION IMPROVEMENTS:
- Pedestrian pathways will be modified during construction, please follow posted detour signage.
- Lake water hot tap will take place on Monday 8/12.
- Forming of concrete slabs continues. Concrete will be poured on Wednesday 8/14.
- Grading work continues this week.
- Emergency vehicles, please utilize alternative routes for access.
- Work hours are 6:30am to 3:30pm, Monday through Friday.
ESCONDIDO ROAD:
- Parking on Escondido Road by Escondido Elementary School will be removed next week to make way for a pedestrian crosswalk.
- Pedestrian pathways will be modified, please follow posted detour signage.
GALVEZ UTILITY IMPROVEMENTS:
- Continuation of new duct bank and lake water installation along Galvez between Memorial Way and Jane Stanford Way.
- Continuation of duct bank installation in front of HHMB and Shultz Building.
- Traffic on Galvez will be reduced to one lane of traffic. Limited parking is available along Galvez.
- Pedestrian and traffic control will be in place along Galvez Mall between Crothers Way and Jane Stanford Way. Please follow directions from flaggers and posted signage.
- Staging area at Auxiliary Library off Pampas.
- Work hours are from 9am to 6pm.
MAPLES PAVILION EXPANSION:
- Construction will continue through the remainder of the year. Expect excessive noise and dust.
- The sidewalk on Campus Drive is closed, please follow posted detour signage.
TAUBE TENNIS SOUTH (ENCINA TENNIS COURTS):
- Intermittent disturbances may occur on the paths adjacent to the courts through the remainder of the year due to construction activities.
- Bike, pedestrian and cart routes have been modified around the site but are still open. Please use caution in this area and follow posted detours.
TAUBE TENNIS STADIUM:
- Demo of the stadium continues. Expect excessive noise and dust.
- The sidewalk on Campus Drive will be closed, please follow posted detour signs to ensure your safety.
- The walking path between the tennis stadium and Avery Aquatic Center will be closed to through traffic. Please follow detour signs around.
SMITH SOFTBALL STADIUM:
- Demo work continues, please expect excessive noise and dust.
- Construction fencing will remain up for the duration of the project.
- Churchill Mall will be closed to pedestrians directly adjacent to the stadium, please follow signs for detours.
- Pedestrian access to Steuber Stadium is limited. Please follow signs for detours and ADA access routes.
340 BONAIR SIDING ROAD DEMOLITION:
- Pre-demolition activities are ongoing at the site.
- Sidewalks, bike lanes and road through Bonair Siding will remain open.
EV UTILITIES RENEWALS:
- Continuation of water main and building services installation in Abrams Court.
- Domestic water service interruptions are scheduled as follows:
- Monday 8/12: Abrams Bldg. domestic water will be shut down for approximately 3 hours. Fire service will be shut down for approximately 8 hours. Fire watch will be provided.
- Wednesday 8/14: Domestic water will be shut down to Buildings 57, 58 & 59 for approximately 8 hours.
- Traffic control will be in place and limited parking will be available. Please follow directions from flaggers and posted signage.
- Work hours are from 8am to 5pm, Monday through Friday.
WILBUR BOWDOIN CROSSWALK:
- Striping and pathway improvements at the intersection of Wilbur Way and Bowdoin Lane continue.
- Work hours will be 8am to 5pm, with no major noise before 9am.
- Please observe parking reservation signs and detours.
MIRRIELEES DOMESTIC WATER IMPROVEMENTS:
- Installation of new domestic water service.
- Traffic control will be in place and limited parking will be available. Please follow directions from posted signage.
- Work hours are from 7am to 4pm.
ESCONDIDO MALL LAKEWATER REPLACEMENT:
- Traffic will be impacted on Escondido Mall and Escondido Road from Galvez Mall to Branner Hall
- Work hours are from 8am to 6:30pm, noisy work begins at 8:30am.
- Installation of new lake water along Escondido Road.
- Staging area on Bowdoin parking lot.
JUNIPERO SERRA BLVD:
- Domestic water replacement work from 9am to 3pm.
- Installation of new water main across JSB.
- Traffic on JSB will be reduced to one lane during work hours from Campus Drive to Santa Maria Avenue.
- Staging area on Gerona Road.
| |
Click to view interactive construction map.
| |
- Avoid using cell phones while walking or biking, especially around construction sites.
- Pay attention to your surroundings as you walk, run, bike, or drive around campus.
- Anticipate detours in construction areas and follow the directions of flaggers and signs.
- If you're riding a bike, follow the rules of the road - stop at signs.
- Allow a little more time than usual to travel on campus.
| |
|
HEADS UP is a campaign designed to inform the campus community of construction activity and to provide strategies for navigating safely, whether on foot or on wheels.
Look out for HEADS UP signs around campus to warn you of construction-related detours or new circulation behaviors.
| |
You are receiving this email as a valued member of our campus community.
Thank you in advance for your understanding and cooperation.