Seamless Estimating Workflow

In the past, construction firms might spend days or weeks setting up budgets in their project management systems, copying over estimate line items, and then updating the work with each revision. Now the team at Trimble Buildings has turned that workflow on its ear by reducing the time from days and weeks to just seconds.

 

In fact, the new estimating lifecycle includes creating feasibility budgets in Modelogix based off of completed project actuals in Prolog; creating detailed estimates in WinEst from the conceptual estimates in Modelogix; creating project budgets in Prolog from detailed estimates in WinEst; and closing out the project with actuals in Prolog and sending the data back to Modelogix for even more precise courtesy estimates for Owners. The workflow is called a closed loop because the system feeds itself with new data, making each new estimate more and more precise with actual numbers from completed projects.

 

If your preconstruction and operations teams want to hone their work for better results -- this is the new estimating lifecycle for your firm. No more manually entering budgets into your project management system; repurpose actuals in order to benchmark new detailed estimates; quickly respond to courtesy estimates; carry your conceptual estimate forward as the starting point for the final estimate. It all flows seamlessly between WinEst, Prolog, and Modelogix -- three solutions from Trimble Buildings working together to improve your productivity.

 

 

WinEst is a very powerful construction estimating solution, in part because it is so flexible. For example, the new Prolog DataLink feature allows the Estimator to either pull an existing Prolog budget structure into a new estimate in WinEst -- or -- push a WinEst estimate into Prolog. The key here is that the Prolog budget codes are mapped to the appropriate Work Breakdown Structures so that items like the Phase, Division, CSI code, scope, extension, category, description, etc. all match the appropriate WBS. Now the data flow is seamless and there is no additional data entry and no opportunity for typing mistakes.

 

 

Prolog is the industry standard for construction project management. One key reason is that best practices are built into 45 different construction workflows, from cost controls (like contracts, purchase orders, budgets, forecasts, cashflow) to document control (like RFIs, submittals, and communications) to field administration. One of the best practices that is built into Prolog is pulling over detailed estimates from WinEst to populate the project budget. Now data entry is eliminated and the operations team can get to work on the fun stuff: getting the building out of the ground. And now, when all actuals are collected and the project is wrapped up, the closed project is seamlessly transferred to Modelogix so it can continue to inform new courtesy estimates and feasibility budgets.

 

 

Construction Estimators can quickly examine past project cost histories in Modelogix and use the detailed information to put together new feasibility budgets, new courtesy estimates, new conceptual estimates when an Owner calls with a new project. Pulling in completed projects with actuals from Prolog for use in Modelogix is now automated with the closed loop integration from Trimble Buildings.

 

In order to make it easier to search and compare tens if not hundreds of similar construction projects, the Estimators needs to apply Smart Categories, or project attributes, to each completed project -- items like project type, square footage, construction type, number of floors, etc. And these Smart Categories are 100% customizable so imagine all the cool classifications you could create. The Estimator can also apply an inflationary index to older projects, as well as a location factor to smooth geography dynamics out of pricing. The original estimate has come full circle and all the effort and hard work that went into creating it can now influence the next estimate with greater precision and accuracy.

 

 

Trimble Buildings is committed to providing more unique workflows for the construction industry. With our extensive portfolio of solutions for GCs and CMs, we have the opportunity to bring many more best practices and integrations to the industry.

 

Learn about other construction workflows unique to Trimble Buildings:

Webinar: Better Quantity Takeoffs from Tekla Models in Vico Office

Webinar: The New Estimating Lifecycle (Modelogix, WinEst, Prolog)

Constructech Article: Trimble Tackles Closed-Loop Integration

 

Reuse - Reduce - Recycle Good Estimating Workflows

We are all familiar with the green recycle logo with the three arrows forming a triangle. Reduce, reuse, recycle is their mantra.

Think about that virtuous cycle when you consider how today’s Estimator develops feasibility budgets, conceptual estimates, full-blown estimates, and project budgets. Data from past projects should be reused to inform new bids. Time to build those estimates should be reduced because the structure is templatized into a corporate standard. And the intellectual property in the project budgets (the geographically-specific material, equipment, and labor costs) should be recycled and exploited.

 

We highlighted this closed-loop integration between Trimble Buildings solutions during a recent Fridays with Trimble webinar – download the recorded webinar and share it with your team.

 

We highlighted a powerful new integration for construction teams between Modelogix for analyzing cost histories, WinEst estimating, and Prolog project management. In this webinar we saw the entire workflow from cost model generation to cost plan development and final estimate to tracking each line item in the budget through to completion on the jobsite and then capturing that completed project cost data for new feasibility budgets. This means that all the precision that went into the WinEst project estimate is tracked with Prolog’s laser-like system of record...from the design to the field to close out and harnessed in Modelogix so the data can be sliced and diced...so that it can be leveraged when the Owner calls with a new project idea and asks for a feasibility budget.

 

And for you process geeks out there, here’s the workflow diagram...

 

Top 4 Webinars of 2013

We are suckers for statistics at Trimble Buildings and as you can probably guess from our heritage with layout solutions, we like to measure everything!

 

So here is the Top 4 list of Fridays with Trimble Webinars from 2013 according to live attendance and recorded webinar downloads...

 

Prolog for Construction Project Management

New from Trimble Buildings is the release of Prolog 9.7. This webinar features a workflow alerting stakeholders about a potential problem with a concrete pour while highlighting new features in 9.7 including more functionality for Superintendents with iPads in the field.

 

Best Practices in Laser Scanning

This webinar examines three best practices for laser scanning on today’s construction projects: (1) creating construction documentation and drawings where none existed; (2) measuring floors for flatness and level; and (3) creating 3D models out of the point cloud data. This webinar shows that laser scanning is not just for retrofits and renovations, but can also be used as a quality assurance check for new buildings, as well.

 

Introduction to Vico Office Document Controller

New from the Trimble Buildings division is Vico Office Document Controller - a new way to work with 2D construction drawings and 3D BIM models. Document Controller quickly identified changes between new versions of 2d drawing sets. It also compares two versions of 3d models and highlights the changes. In the new hybrid view, BIM Managers can compare the 2D drawing to the 3D model before work is sent out for prefabrication. And, of course, the change management steps are built into the Vico Office 5D Workflow.

 

Klorman Construction and the LAX Terminal Expansion Project

Klorman Construction outlines their technology strategy for bidding, building, and delivering the Tom Bradley International Terminal expansion project at LAX. Klorman chose Trimble Buildings solutions including Tekla, Prolog, and Vico to complete the new terminal. See ROI statements from this project along with unique workflow for project management, BIM modeling and clash avoidance, location-based scheduling and estimating.

 

Of course, you can always check out our library of recorded Fridays with Trimble webinars (there are over 60!) and watch them at your own convenience.

       

 

For more information on Trimble Buildings, our hardware, software, and VDC service offerings, or the AGC BIMForum, please visit our website or contact Holly Allison directly at +1-978-882-0170 x118.

 

Trimble Buildings GC/CM Group >< 120 Washington Street, Suite 202-C >< Salem, MA 01970 >< +1-978-882-0170