This week, the construction of the new sidewalks continues north of the flag pole area to the north end of the municipal beach
. The contractor anticipates completing the project by the end of October, although some small items may continue to be improved in the weeks following.
The new sidewalk is being poured both east and west of the new knee-wall. The concrete encapsulation of the existing knee-wall is complete and should be painted this week. The construction of both the north and south small gazebos has begun and should be substantially completed within the next two weeks.
In order to provide continual public safety for the residents and guests attending the beachfront, beach access is available at the main Pavilion and at the Marriott Hotel designated cross walk.
On-street parking north of the Marriott Hotel to Beach Road is not permitted.
It is very important that folks accessing the beach only use the identified access points, which provide safe entry. These safe entry points are currently located by the Sandoway Parking Lot, the main Pavilion, and the Thomas Street designated crosswalk.
New parking meters are installed along the beachfront at the southern end of the municipal beach from Casuarina Road going north to Boston's On the Beach and are operational.
A third Downtown Roundabout trolley between the parking garages and the Beach is available. A map of the new route is accessible on the City's website at
www.mydelraybeach.com
.
Beach Promenade benches, plaques and stone memorials have been removed and safely stored. Any donor of the same should contact Isaac Kovner at 561-243-7000, ext. 4119, to discuss options for future location.
Upcoming Activities:
- Underground piping and backfilling for the new showers and fountains between Beach Road and the north end of the project is complete.
- The pouring of all three concrete colors for the sidewalk continues until the end of the month.
- Installation of the new trash receptacles, bike racks, Oolite blocks, and benches is ongoing.
- Painting the new knee-wall will begin this week.
- Landscaping and final irrigation has begun.
Parking:
Parking has been restored on the southern end of the municipal beach from Casuarina Road to the beginning of the current work zone at Boston's. Smart meters have now been installed and are operational.
Pay-by-plate has been activated so you're no longer required to place a receipt on the dashboard. Adding time to your meter can be done at any parking meter, simply by putting in your license plate number. Additionally, the City launched Parkmobile, an app that allows you to pay for parking throughout the City. It provides the added convenience of allowing you to add time to your parking stay through your phone without leaving your current location.
As construction continues on the Promenade, certain on-street parking spaces along the beach will remain unavailable to accommodate the installation of landscaping. However, we will continue to make every effort to make parking alternatives accessible whenever possible. Parking in all public parking lots along the beach, including the Sandoway parking lot, will continue to be available. For those who choose to park in public parking garages, a third trolley has been added with a new route featuring stops at the parking garages and additional stops along the beach to accommodate beach-goers.
Bicycle lanes:
Bicyclists will be able to use the bicycle lane, but we urge extra caution in this area. The bicycle lane on South Ocean Boulevard will be narrowed to protect the general public from the construction activities.
Worksite Safety:
The contractor has secured the Beach Promenade area on the north end of the beach to create two safe zones - one for protected sidewalk and beach access for the public and one for protection of the construction site. Directional and informational signage is present. Utility structures, irrigation, electrical and existing trees are protected from construction activities.
Public notifications concerning sidewalk closures are posted. The contractor is working with the public on providing safe entry to the beach through designated areas within the construction zone.
Contact information:
If you have any questions concerning parking during construction and the use of the smart meters please contact Jorge Alarcon, (561) 243-7000, ext. 4112.
For the trolley service, please contact Xavier Falconi at (561) 243-7000 ext. 4113.
For general questions concerning the construction, please contact Isaac Kovner at (561) 243-7000 ext. 4119.
Stay informed with weekly up-to-date information by visiting our website (
www.mydelraybeach.com
) and information boards.
The City apologizes for any inconvenience the construction may impose. We thank you for your patience and understanding.
|
__________________________________________________________________________
STAY CURRENT WITH CRITICAL INFORMATION REGARDING EMERGENCY SITUATIONS
Sign up for CodeRED, an automated notification system that allows the City to call up to 60,000 phone numbers per hour with a recorded message to alert you on various situations including natural disasters, severe weather conditions, water contamination, chemical spills and more.
To learn more about Code
RED and/or to sign up, click
here.
___________________________________________________________________
|
City Commission:
Mayor Cary Glickstein
Vice-Mayor Jim Chard
Deputy Vice-Mayor Shirley Johnson
Commissioner Mitch Katz
Commissioner Shelly Petrolia
City of Delray Beach, 100 NW 1st Avenue, Delray Beach, FL 33444
(561) 243-7000
|
PUBLIC RECORDS NOTE: Florida has a very broad public records law. Most written communications to or from local officials, employees, or the general public regarding city business are public records available to the public and media upon request. Your e-mail communications may therefore be subject to public disclosure.
|
|
Copyright © 2013. All Rights Reserved.
|
|
|
|
|
|
|
| |
|
|