PLACER/NEVADA/SIERRA COUNTIES – Caltrans is alerting motorists of the potential for extended delays along Interstate 80 (I-80) stretching between Colfax to the Nevada state line as several projects and emergency repairs get underway for the 2024 construction season.
Once all projects are active, delays across the corridor may reach up to a maximum of two hours. Motorists are advised to use alternate routes, if possible, to help reduce any potential delays. The schedule is subject to change or be delayed due to weather, availability of materials or other unexpected events.
Crews are returning to the same areas as last year for emergency wheel rut repairs and concrete slab replacements. Work is currently underway within Location 1 between Colfax and Alta. Additional work within Locations 2 and 3 are expected to resume next week, followed by Locations 4 and 5 by the end of the April.