|
Recovery efforts are divided into three packages:
1) Infill Walls (underway),
2) Bethany Culvert (May ’24), and
3) Rip Rap Replacement (TBD) to fix damages and ensure the safety and functionality of the roadway, paths, and surrounding areas.
For safety, West Cliff Drive will be fully closed to all users around the Bethany culvert project, necessitating a pedestrian detour up David Way to Oxford Way and back to Woodrow Ave.
|